New 12,000 SF concrete structure to connect the third level of the main adult detention facility to the basement level of the new courthouse. The project consists of a 135’ bridge, a 47’ high elevator and stair tower, and a 218’ subterranean pedestrian tunnel. TBC performed all the excavation, concrete placement, and associated civil work.
Property Details
Property Type
Correctional
Year Built
Final Contract Amount
2020
$9,085,658